Small progress, but it’s still progress.

Didn’t get much done, but I did get the new -6AN transmission lines made and installed. I also got the new extra-capacity transmission pan installed. Now I need to tidy up a few wires since I can access them right now with the right side header off and out of the way. I also need to mock up and weld my forward and aft engine limiters out of 1/2″ steel tube and 1/8″ plate.