Parts Are Back

My parts are back from the machine shop/welder. I had wastegate flanges welded to my CXRacing 3″ Vband to T4 elbows, the 50mm blow-off valve mount welded to the air charge pipe and bungs welded to the valve covers for the breather setup. Read more
It's only fair to share...Share on FacebookShare on Google+Tweet about this on TwitterShare on LinkedIn

I sold my turbos, now what?

I sold my turbos (two 69mm GT45s), so now what? New turbos of course. I ordered two Rev9 60/62 .70 ar turbos. The much smaller exhaust housing and ar should let these spool much quicker and make as much power if not more. I also sent my cast stainless elbows off to be machined and welded for the wastegates to be mounted. Both valve covers to have -10 fittings welded onto them for the catch can and my air charge pipe to have the blowoff valve mount welded on. Video Below   Read more
It's only fair to share...Share on FacebookShare on Google+Tweet about this on TwitterShare on LinkedIn
1 2 3 4 81